D2L Brightspace downtime Nov. 10
On Tuesday, November 10th, there will be a D2L Brightspace downtime from 4:00 AM to 8:00 AM.
This downtime is to install a cumulative update from version 10.5.0 to version 10.5.3. D2L will be unavailable to users during this time period. If the update can be completed earlier, the D2L Brightspace environment will be made available to users before 8:00 a.m.
The update status will be posted at http://status.mnscu.edu/desire2learn/
Please take this down time into consideration when planning your D2L Brightspace usage.
Categories :