Partial Campus Power Outage on December 31
A power outage is scheduled for December 31, 2025, to repair the electrical cables that were damaged in November near Flora Frick Hall. The buildings impacted by this shutdown include Owens Hall, Bridges Hall, Center for the Business and the Christianson Alumni Center. During this time, these four buildings will be without power, have minimal lighting and will not have […]