Electronic door system modifications
There will be modifications made to the Electronic door system over the next 6 weeks. This work requires that the door system will be completely down, no cards will function. As each facility is worked on the affected doors will be secured in an open manner for traffic flow of employees.
Here is the schedule that will be followed. Each part of this schedule may change depending upon if there are problems with the installation.
Lommen: May 11 – 18
Library: May 19 – 26
Owens: May 27 – 28
Weld: May 29 – 1
MacLean: June 2 – 9
Center for the Arts: June 9 – 22
Categories :
Tags :